Dürr · Application control
EcoAUC2 application controller
Bring paint application, dosing, colour-change and cleaning functions into one control system. Review the equipment, interfaces and configuration needed for your installation.

Where EcoAUC2 fits
EcoAUC2 is the current application-controller generation described here. It can be considered when planning an integrated paint application system or reviewing an existing controller installation. The required equipment, cleaning functions and robot or PLC interfaces are checked for the selected configuration.
Benefits
- Compact control cabinet for process control, compressed-air control and visualisation
- Integrated control of cleaning equipment
- Interfaces for robot control and safety PLC integration
- Additional industrial network interfaces
- High-speed discharge for electrostatic application
- Integrated into Dürr ready2integrate
Technical data
All variants are included below. Scroll the table horizontally on a smaller screen.
| Specification | EcoAUC2 — current | EcoAUC — predecessor |
|---|---|---|
| Technical data | ||
| Maximum base colours | Up to 20 | Up to 10 |
| Maximum hardeners | Up to 5 | Up to 3 |
| Operator display | 10-inch touch screen | 7-inch touch screen |
| Cleaning-equipment control | Integrated | Not specified |
| Additional interface options | PROFINET / EtherNet/IP / DeviceNet | Not specified |
Values and variant designations are reproduced from the existing source records. Blank or dashed source entries are shown as “Not specified”. Confirm the exact configuration against its applicable manufacturer manual.
Manuals and order information
EcoAUC — legacy order information
Open document ↗EcoAUC — legacy manual
Open document ↗EcoAUC2 — current order information
Open document ↗Source charts and references
What to prepare for an enquiry
- Installed controller and application-equipment model numbers.
- Required colours, hardeners, dosing functions and cleaning devices.
- Robot or PLC interface requirements and available system drawings.
- Coating material, existing configuration and the change you want to make.